How we define a whole-house solar generator
Short answer
We count a system as whole-house capable when it can feed an essential-loads panel or 240V loads through transfer equipment, delivers at least 3,600W per unit, and expands well beyond one day of essentials. The best whole house solar generator for you is the one sized to your panel's loads, your 240V needs and your outage length.
Whole-house coverage criteria
- Voltage: 120/240V split-phase (from one unit or paired units) if 240V loads must run; 120V is enough for many essential-loads panels.
- Output: enough continuous watts for the backed-up circuits, and surge for the largest motor.
- Energy: a base unit of several kWh, expandable with add-on batteries.
- Integration: a supported transfer switch or home panel, ideally with automatic switchover.
- Recharge: high solar input and a path to keep charging during an outage.
120/240V and transfer equipment
Split-phase output is what allows a system to feed a standard North American panel, where 240V loads draw across two 120V legs. Transfer equipment isolates the home from the grid during an outage, which protects utility workers and is required by code. Ask the maker which transfer products are supported for each model, and whether 240V needs one unit or two.
Scorecard
We scored each system 1 to 5 on five criteria from its listing, then totaled them. Higher is better. This is a desk comparison of stated specifications, not a test.
| System | Output | Base energy | Expansion | Integration | Warranty clarity | Total /25 |
|---|---|---|---|---|---|---|
| EcoFlow DELTA Pro Ultra X | 5 (12,000W) | 5 (12,288Wh) | 5 (to 180kWh) | 4 (under 20ms switchover) | 3 (not stated in details we read) | 22 |
| EcoFlow TITAN 5000 Classic | 3 (4,000W) | 4 (5,017Wh) | 4 (to 30kWh) | 4 (Smart Home Panel 10, sold separately) | 5 (5-year on listing) | 20 |
| Growatt HELIOS 3600 | 3 (3,600W; 7,200W/240V with two) | 3 (3,600Wh) | 4 (to 36kWh) | 3 (transfer switch) | 3 (not stated in details we read) | 16 |
The systems
Whole-house systems
Highest output and base capacity
EcoFlow DELTA Pro Ultra X
12,288Wh (one inverter and two batteries) and 12,000W per the listing, expandable to 180kWh, with under-20ms switchover when the grid fails. The strongest stated specs of the three.
The listing states
- 12,288Wh (1 inverter + 2 batteries)
- 12,000W output, expandable to 180kWh
- Under 20ms switchover, per the listing
Check before you buy
- Installation and integration needs
- Limited stock shown on the listing
- Where it will live
- The inverter and battery ship in separate packages. Listing shows limited stock.
Skip it if: you only need a few circuits; this is a lot of system.
Amazon listing B0GQGZ5J8N, details checked November 21, 2026 on the Amazon listing.
Best value for automatic circuit backup
EcoFlow TITAN 5000 Classic
5,017Wh LiFePO4, 4,000W, expandable from 5kWh to 30kWh, with under-20ms automatic switchover through EcoFlow's Smart Home Panel 10 (120V) and a five-year warranty, per the listing.
The listing states
- 5,017Wh LiFePO4, 4,000W AC output
- Expandable from 5kWh to 30kWh
- Under 20ms automatic switchover with EcoFlow Smart Home Panel 10 (120V)
Check before you buy
- Smart Home Panel 10 cost and installation
- It is 120V; check any 240V loads
- The Smart Home Panel 10 is sold separately and must be installed by an electrician.
Amazon listing B0HJZSDJZP, details checked November 21, 2026 on the Amazon listing.
Best path to 240V
Growatt HELIOS 3600
3,600Wh and 3,600W per unit, expandable to 36kWh; the listing states two units in parallel give 240V/7,200W through a transfer switch, and it lists cold-start operation down to -22°F.
The listing states
- 3,600Wh LFP battery, 3,600W output
- Two units in parallel give 240V/7,200W (listing)
- Expandable to 36kWh, 2,000W solar input
Check before you buy
- Two units are needed for 240V
- 240V requires two units and a transfer switch installed by a licensed electrician.
Amazon listing B0DF7SZJWY, details checked November 21, 2026 on the Amazon listing.
Runtime by system
| System (base configuration) | Usable at 85% | 10 kWh/day essentials panel | Fridge + essentials (1,940Wh/day) |
|---|---|---|---|
| Growatt HELIOS 3600 (3,600Wh, one unit) | About 3.1 kWh | About 7 hours | About 1.6 days |
| EcoFlow TITAN 5000 Classic (5,017Wh) | About 4.3 kWh | About 10 hours | About 2.2 days |
| EcoFlow DELTA Pro Ultra X (12,288Wh) | About 10.4 kWh | About 25 hours | About 5.4 days |
The table shows why expansion matters: one base unit carries a small home's essentials for a day or two, but a full essential-loads panel drains it overnight.
What your electrician will do
Every system on this page needs an electrician to connect it to your home. Expect the visit to cover:
- A load review: which circuits you want backed up, and their running and starting currents.
- Choosing the transfer method the maker supports: a transfer switch, an interlock with an inlet, or the maker's home panel.
- Checking your main panel's space and condition, and whether a subpanel for essential loads makes sense.
- Pulling any permit your jurisdiction requires and arranging inspection.
- Installing and testing switchover with the station connected, then showing you how to operate it.
Ask for a written, itemized quote that names the exact equipment model numbers. That makes it easy to compare electricians and to check the work against the maker's installation manual.
Living with a large system
Whole-house capable stations are big, heavy units. Plan a permanent spot that is dry, within the manual's temperature range, close to where the transfer equipment will be installed, and clear of anything blocking the vents. Garages are common, but check the manual for temperature limits, since many lithium batteries cannot charge below freezing. Cooling fans run under heavy load and fast charging, so a utility room is usually a better neighbor than a bedroom wall. If you add expansion batteries, leave room for them and their cables from day one.
Warranty and support for large systems
A whole-house system is a long-term purchase, so support matters as much as specs. In our November 2026 check, the TITAN 5000 Classic listing stated a five-year warranty; the details we read for the other systems did not state a term. Confirm the term on the exact listing and on the maker's warranty page, and find out whether coverage changes if the unit is permanently connected to a home panel. Ask how service works for a unit this large and heavy, especially with expansion batteries attached: who arranges pickup or shipping, and who pays for it. Keep the installer's paperwork with the warranty documents, since some makers ask for proof of professional installation.
Installed alternatives
Installed home batteries from solar contractors are the other route, often with automatic whole-home switchover and integration with rooftop solar. The content strategy for this site cites the BLUETTI EP900 as one such system (BLUETTI EP900 product page); check current specifications with the maker and a local installer. The DOE's homeowner guide is a good primer before talking to installers (DOE Homeowner's Guide).
Rooftop solar on its own usually does not keep your lights on in a blackout. The U.S. Department of Energy explains that grid-tied solar panels may shut down when the grid goes down, and that backup power needs a suitable inverter and battery storage configured for it (DOE).
Before you choose
If the scorecard leaves two systems close, let your electrician's load review decide. The right answer is the one that covers your backed-up circuits' combined running load, your largest motor start at 240V, and the hours or days you want, at an installed cost you are comfortable with.
- Get a load analysis from an electrician: which circuits, what running and starting loads.
- Pick the voltage and output you need first; then pick storage for your outage length.
- Confirm the transfer equipment, its installed price and whether it switches automatically.
- Confirm warranty terms on the exact listing and register the product.
- Plan solar recharge and confirm it works with the grid down.
Read the whole house solar generator guide for the background, compare costs in whole house solar generator prices, and see the most powerful solar generators if output is your deciding factor.
Fuel generator safety. If your plan includes a gas or propane generator, the CPSC says to run it outdoors only, at least 20 feet from the house, with the exhaust pointed away from windows, doors and vents. Never run one inside a home or garage, even with the door open, and install battery-powered carbon monoxide alarms. Source: U.S. Consumer Product Safety Commission generator safety warning.
Bottom line
Start with an electrician's load review, then match a system to it: the DELTA Pro Ultra X for the most output and capacity, the TITAN 5000 Classic for automatic 120V circuit backup, and two Growatt HELIOS 3600 units for 240V. Budget for transfer equipment and extra batteries from the start.
Sources
- U.S. Department of Energy: Homeowner's Guide to Going Solar
- U.S. Department of Energy: Solar and Resilience Basics
- NREL: Technology Tips for Solar + Storage (PDF)
- U.S. Consumer Product Safety Commission generator safety warning
Product specifications come from the Amazon listing for each model, checked on the date shown in its card. Confirm current details on the listing or the manufacturer's manual.